Once you know the ECOSISM system we request the necessary documentation
(the whole project plans) to correctly interpret the planned work.
Once we analyze said plans we obtain from our technical departement
and commercial departement a preventive Proposal.
Eventually is requested
an information exchange between our department foreman and the
planner to optimize work results using ECOSISM system.
Once we analyze these plans we obtain a preventive proposal from our
technical and commercial department. Eventually an exchange of information
is requested between our department foreman and the planner,
to optimize work results using ECOSISM system.
The preventive Proposal explains peculiar conditions to accomplish the
work such as wall surfaces settlement, even if ceiling and roof are included
in work, concrete volume needed, iron reinforcement needed, and
timing, and finally also the additional material settlement.
In a similar way the Proposal explains the material's carriage method and
even if an assembling team is requested for training or for accomplishment
of a rough structure.
Once the proposal is defined the contract will be finalized. Then the technical
department haveto draw the production table act for the final
agreement.
The agreement signature of responsible planner on the executive
plan is needed to complete the process and start the production.
|