A “READY TO GO” SYSTEM: From design to laying

Once you know the ECOSISM system we request the necessary documentation (the whole project plans) to correctly interpret the planned work. Once we analyze said plans we obtain from our technical departement and commercial departement a preventive Proposal.
Eventually is requested an information exchange between our department foreman and the planner to optimize work results using ECOSISM system.
Once we analyze these plans we obtain a preventive proposal from our technical and commercial department. Eventually an exchange of information is requested between our department foreman and the planner, to optimize work results using ECOSISM system.
The preventive Proposal explains peculiar conditions to accomplish the work such as wall surfaces settlement, even if ceiling and roof are included in work, concrete volume needed, iron reinforcement needed, and timing, and finally also the additional material settlement. In a similar way the Proposal explains the material's carriage method and even if an assembling team is requested for training or for accomplishment of a rough structure.
Once the proposal is defined the contract will be finalized. Then the technical department haveto draw the production table act for the final agreement.
The agreement signature of responsible planner on the executive plan is needed to complete the process and start the production.